Answer 5 questions. Get your ASHE ICRA 2.0 precaution class (I–V), a readiness score, and a personalized compliance checklist for your project. About 60 seconds. Built from the ICRA matrix — the same one surveyors expect on the permit.
What precaution class does your project need?
The ICRA matrix crosses your activity type (A–D) with the patient risk group (Low–Highest) to set your precaution class. This check runs that matrix for you, then scores how ready your process is — team, timing, and occupancy.
Built from the ASHE ICRA 2.0 matrix described in our ICRA matrix guide. This is a planning aid, not a substitute for your infection prevention team’s documented assessment.