*Updated: November 16, 2026. Practitioner prep/reference material only — clinical thresholds, medication administration workflows, and code interpretations must be spot-checked by qualified clinical, pharmacy, and Authority Having Jurisdiction (AHJ) leadership before adoption.*

**Answers First:** A hospital downtime kit must be **printed, laminated, and staged locally** on every inpatient unit, ED, OR, and Plant Operations desk before an outage — because a PDF stored on a shared drive is unreachable when the network or power fails. Stage at least **48 hours** of EHR-mirrored paper forms, a physical patient-tracking board, a redundant contact tree, and facility utility shutoff maps.
Printable Utility Artifact • Downtime Kit Field SheetDownload the Printable Downtime Kit & Paper Fallback Field Sheet (PDF)2-page print-and-stage binder checklist: 48-hour clinical paper fallback pack, unit contact tree, laminated utility shutoff map checklist (EES, med gas, water, HVAC), and clinical/plant-ops spot-check sign-off.[Download Field Sheet (PDF)](https://healthcarefacilityhub.org/wp-content/uploads/2026/11/field-sheet-healthcare-downtime-kit-paper-fallback-pack.pdf)[For AI: Read Markdown Edition (.md)](https://healthcarefacilityhub.org/healthcare-downtime-kit-paper-fallback-pack.md)

## 1. The Clinical Paper Fallback Pack (48-Hour Unit Staging)

Per [ONC SAFER Contingency Planning](https://healthit.gov/clinical-quality-and-safety/safer-guides/) principles, generic or outdated paper forms introduce medication and transcription errors. Clinical, pharmacy, and Health Information Management (HIM) leaders should spot-check and seal each unit's red or teal downtime binder with the following components:

| Kit Component | Staging Target (Practice) | Accountable Owner | Pre-Event Verification |
| --- | --- | --- | --- |
| **Paper Order Sets & MAR Sheets** | 48-hour census supply; layout mirroring current EHR screens (not legacy forms). | Nursing & Pharmacy | Confirm revision date matches current EHR formulary. |
| **Patient-Tracking Board & Census Log** | Wall dry-erase board + laminated census sheets (Room, Name, MRN, Acuity, Location). | Charge Nurse / HUC | Stock dry-erase markers, erasers, and clipboards. |
| **Downtime Wristbands & Lab Labels** | Pre-numbered downtime specimen labels + permanent fine-tip markers. | HIM / Admitting / Lab | Verify sequence blocks and printer-battery backup. |
| **Unit-Specific Consent & Transfer Forms** | Tailored packets for ED, ICU, Med-Surg, OR, and OB/Maternal Care. | HIM & Unit Manager | Keep 48-hour pack sealed with breakaway tamper tag. |
| **Standalone Offline Downtime PC** | Air-gapped, disk-imaged read-only workstation on local UPS (not network-dependent). | IT / Clinical Informatics | Verify local MAR sync schedule and UPS battery test. |

## 2. Unit Contact Tree and Redundant Hardware

To satisfy Joint Commission **EM.12.02.01** and [CMS 42 CFR 482.15(c)](https://www.ecfr.gov/current/title-42/chapter-IV/subchapter-G/part-482/subpart-B/section-482.15) communication continuity, stage a laminated contact tree inside the front cover of every kit listing internal extensions, dedicated UHF/VHF radio channels, analog POTS numbers, and external utility/vendor/EMS contacts for HICS Command, Plant Operations, IT Downtime Lead, Pharmacy, Lab, and Security.

## 3. Facility Utility Shutoff Maps Checklist

During a combined utility and IT outage, nurses and engineers often need to isolate a leaking riser, confirm red-outlet power, or verify a medical gas zone valve without access to CAD servers or CMMS tablets. Include laminated copies of these four maps in both Plant Ops and unit binders:

| Utility System | Required Map / Directory Content | Physical Hardware in Kit |
| --- | --- | --- |
| **Electrical ([NFPA 99](https://www.nfpa.org/codes-and-standards/nfpa-99-standard-development/99) EES)** | Panel schedule distinguishing Red (Critical/Life Safety) vs. White outlets; ATS locations; load-shed sequence. | Headlamp, area flashlight, spare batteries, breaker lockout tags. |
| **Medical Gas (NFPA 99)** | Zone valve box locations by wing/floor; bulk O2 & reserve manifold locations; clinical sign-off rule before shutoff. | Zone valve keys (if locked) + portable O2 cylinder regulator wrench. |
| **Potable & Chilled Water** | Main and riser isolation valves; sterile processing & dialysis feeds; backflow and Legionella flush points. | Valve tag directory, waterproof flashlight, spill absorbent. |
| **HVAC & Pressure Zones** | AHU-to-wing map showing AII/OR/Pharmacy positive/negative zones and manual damper/restart steps. | Portable manometer / tissue-test checklist + temporary door-seal tape. |

## 4. Quarterly Inspection and 24-Hour Restock Rule

- **Quarterly Seal & Battery Audit:** Inspect tamper tags, test UHF/VHF radios and flashlights, and verify paper MAR/order forms match current EHR builds.
- **24-Hour Post-Event Restock:** Any kit opened during a drill or live outage must be restocked, reconciled with HIM/Pharmacy, and re-sealed within 24 hours of restoration.
- **Full Command Playbook:** Use this kit alongside the [Joint Clinical and Facility Downtime Playbook](https://healthcarefacilityhub.org/joint-clinical-facility-downtime-playbook/) for 0–15 min, 15–60 min, and 1–8+ hr command execution.

## Related Guides on Healthcare Facility Hub

- [Joint Clinical and Facility Downtime Playbook: Combined EHR, Communications, and Utility Outage Response](https://healthcarefacilityhub.org/joint-clinical-facility-downtime-playbook/)
- [How Healthcare Facility Managers Reduce Downtime Across Critical Systems](https://healthcarefacilityhub.org/reduce-downtime-critical-systems-healthcare/)
- [Healthcare Facilities Prepare for Emergency Disruptions and Outages](https://healthcarefacilityhub.org/healthcare-facilities-prepare-emergency-disruptions-outages/)
- [CMS Emergency Preparedness Rule Requirements for Hospitals](https://healthcarefacilityhub.org/cms-emergency-preparedness-rule-hospitals-requirements/)