Healthcare Downtime Kit and Paper Fallback Pack: Printable Field Sheet and Pre-Staged Unit Checklist

Updated: November 16, 2026. Practitioner prep/reference material only — clinical thresholds, medication administration workflows, and code interpretations must be spot-checked by qualified clinical, pharmacy, and Authority Having Jurisdiction (AHJ) leadership before adoption.

Answers First: A hospital downtime kit must be printed, laminated, and staged locally on every inpatient unit, ED, OR, and Plant Operations desk before an outage — because a PDF stored on a shared drive is unreachable when the network or power fails. Stage at least 48 hours of EHR-mirrored paper forms, a physical patient-tracking board, a redundant contact tree, and facility utility shutoff maps.
Printable Utility Artifact • Downtime Kit Field Sheet
Download the Printable Downtime Kit & Paper Fallback Field Sheet (PDF)
2-page print-and-stage binder checklist: 48-hour clinical paper fallback pack, unit contact tree, laminated utility shutoff map checklist (EES, med gas, water, HVAC), and clinical/plant-ops spot-check sign-off.

1. The Clinical Paper Fallback Pack (48-Hour Unit Staging)

Per ONC SAFER Contingency Planning principles, generic or outdated paper forms introduce medication and transcription errors. Clinical, pharmacy, and Health Information Management (HIM) leaders should spot-check and seal each unit’s red or teal downtime binder with the following components:

Kit ComponentStaging Target (Practice)Accountable OwnerPre-Event Verification
Paper Order Sets & MAR Sheets48-hour census supply; layout mirroring current EHR screens (not legacy forms).Nursing & PharmacyConfirm revision date matches current EHR formulary.
Patient-Tracking Board & Census LogWall dry-erase board + laminated census sheets (Room, Name, MRN, Acuity, Location).Charge Nurse / HUCStock dry-erase markers, erasers, and clipboards.
Downtime Wristbands & Lab LabelsPre-numbered downtime specimen labels + permanent fine-tip markers.HIM / Admitting / LabVerify sequence blocks and printer-battery backup.
Unit-Specific Consent & Transfer FormsTailored packets for ED, ICU, Med-Surg, OR, and OB/Maternal Care.HIM & Unit ManagerKeep 48-hour pack sealed with breakaway tamper tag.
Standalone Offline Downtime PCAir-gapped, disk-imaged read-only workstation on local UPS (not network-dependent).IT / Clinical InformaticsVerify local MAR sync schedule and UPS battery test.

2. Unit Contact Tree and Redundant Hardware

To satisfy Joint Commission EM.12.02.01 and CMS 42 CFR 482.15(c) communication continuity, stage a laminated contact tree inside the front cover of every kit listing internal extensions, dedicated UHF/VHF radio channels, analog POTS numbers, and external utility/vendor/EMS contacts for HICS Command, Plant Operations, IT Downtime Lead, Pharmacy, Lab, and Security.

3. Facility Utility Shutoff Maps Checklist

During a combined utility and IT outage, nurses and engineers often need to isolate a leaking riser, confirm red-outlet power, or verify a medical gas zone valve without access to CAD servers or CMMS tablets. Include laminated copies of these four maps in both Plant Ops and unit binders:

Utility SystemRequired Map / Directory ContentPhysical Hardware in Kit
Electrical (NFPA 99 EES)Panel schedule distinguishing Red (Critical/Life Safety) vs. White outlets; ATS locations; load-shed sequence.Headlamp, area flashlight, spare batteries, breaker lockout tags.
Medical Gas (NFPA 99)Zone valve box locations by wing/floor; bulk O2 & reserve manifold locations; clinical sign-off rule before shutoff.Zone valve keys (if locked) + portable O2 cylinder regulator wrench.
Potable & Chilled WaterMain and riser isolation valves; sterile processing & dialysis feeds; backflow and Legionella flush points.Valve tag directory, waterproof flashlight, spill absorbent.
HVAC & Pressure ZonesAHU-to-wing map showing AII/OR/Pharmacy positive/negative zones and manual damper/restart steps.Portable manometer / tissue-test checklist + temporary door-seal tape.

4. Quarterly Inspection and 24-Hour Restock Rule

  • Quarterly Seal & Battery Audit: Inspect tamper tags, test UHF/VHF radios and flashlights, and verify paper MAR/order forms match current EHR builds.
  • 24-Hour Post-Event Restock: Any kit opened during a drill or live outage must be restocked, reconciled with HIM/Pharmacy, and re-sealed within 24 hours of restoration.
  • Full Command Playbook: Use this kit alongside the Joint Clinical and Facility Downtime Playbook for 0–15 min, 15–60 min, and 1–8+ hr command execution.