How to Perform an Infection Control Risk Assessment Before a Hospital Renovation
How do I perform an infection control risk assessment before a hospital renovation? Seven steps from team assembly to decommissioning
Joint Commission, CMS, OSHA, and state health department compliance requirements for healthcare facility managers.
How do I perform an infection control risk assessment before a hospital renovation? Seven steps from team assembly to decommissioning
What is the ASHE ICRA 2.0 matrix and how do I use it? Activity type × patient risk group =
What are the requirements for ICRA Class IV and V projects? Class IV/V: NFPA 241 critical barriers, continuous negative pressure,
How often should ICRA monitoring be done during healthcare construction? Daily walkthroughs for Class III and above — continuous pressure
What barriers are required for ICRA Class III construction? Class III containment: critical barriers before work begins, HVAC isolation, sealed
Who needs to be on the ICRA team for a hospital construction project? The ICRA team: infection prevention, engineering, construction,
What is a Class IV construction barrier in healthcare? Class IV containment: hard barrier to the deck, anteroom, HEPA exhaust,
What fire rating do temporary construction barriers need in hospitals? A rated temporary barrier: sealed floor to ceiling, firestopped penetrations,
What mil polyethylene is required for ICRA containment barriers? Fire-retardant 6-mil polyethylene, sealed top to bottom with a full-length zipper
How do you build an anteroom for healthcare construction? The anteroom airlock creates a pressure cascade — corridor to anteroom
What is negative air pressure and why is it used in hospital construction? Negative pressure keeps air flowing inward —
How do you monitor pressure differentials during hospital construction? A data-logging manometer in the anteroom proves the containment held negative
Healthcare Facility Hub — the weekly brief. Surveys, water, plant and readiness, every week.