Healthcare Construction Containment Guide: ICRA Barriers, Negative Pressure, and Daily Checks

Updated Oct 31, 2026 — added the free containment quick-reference card, containment permit & daily checks pack, and containment copilot downloads to this guide.

Direct answer: Healthcare construction containment is the physical system that keeps dust, fungal spores, and contaminated air from leaving a work zone in an occupied facility. The barrier, the airflow, the entry path, the housekeeping, and the paperwork all count as part of it. The ASHE ICRA 2.0 matrix tells you which class of precautions a job needs (Class I through V). Containment is how you build that class, keep it working every shift, and take it down without letting dust out at the last minute. In occupied buildings the same barrier is usually also a life-safety element, so Interim Life Safety Measures (ILSM) and NFPA 241 apply to it too.

Take this to the job site.

This article as a one-page field sheet – the direct answer, the key numbers, and the checklist. Free PDF, prints clean, works offline.

Download the field sheet (PDF)

Email it to me instead

Get the weekly brief

Surveys, water, plant and readiness — what we measured and what changed in facility operations, every week.

Subscription Form

This guide is for hospital facilities teams, construction project managers, infection preventionists, and the trade contractors who do the work. It goes through containment element by element, shows how each one ties back to the ICRA 2.0 matrix and CDC guidance, marks the places where the published sources stop short of a hard number, and ends with checklists you can drop into a permit packet.

Need the class first? Use the ICRA Class Finder to read your class off the ASHE ICRA 2.0 matrix, or the ICRA Readiness Check to score how ready your project is before mobilization.

Instant Operational Downloads

Equip Your Job Site or Feed Your AI Assistant

Field-tested compliance tools built directly from ASHE ICRA 2.0, CDC Guidelines, and NFPA 241 requirements.

Quick Reference FREE

Containment Quick-Reference Card

2-page field card: Class I–V finder matrix, asterisk raise rule, 5 containment elements, and daily check essentials.

Download Free PDF

Direct download • No email gate

Working Pack $7

Containment Permit & Checks Pack

Printable/fillable working pack: Pre-construction permit checklist, Table 4 surroundings sheet, daily shift logs, and breach/teardown sign-off.

Get Permit & Checks Pack ($7) →

Instant checkout • Square verified

AI Intensive
Book for Bots $17

Containment Copilot

Feed to ChatGPT or Claude: 5 AI-run routines (/class, /package, /readiness, /audit-daily, /breach, /teardown) with embedded output router.

Get Containment Copilot ($17) →

Software made of words • Instant delivery

Related Guides

What containment is (and what it is not)

An infection control risk assessment (ICRA) is a decision process, and three different bodies stand behind it. The federal starting point is CDC’s 2003 Guidelines for Environmental Infection Control in Health-Care Facilities, developed with HICPAC, which tells facilities that “before the project gets underway, perform an ICRA to define the scope of the project and the need for barrier measures” (CDC, Part II recommendations). For how that assessment turns into a precaution class, see our ICRA matrix breakdown.

The matrix most U.S. hospitals use today is ASHE ICRA 2.0, published in April 2022 by the American Society for Health Care Engineering of the American Hospital Association. It pairs construction activity Types A–D with four patient risk groups to assign Classes I–V, and ASHE makes the matrix and sample permit free to the public (ASHE ICRA 2.0 Toolkit). Our step-by-step guide to the ASHE ICRA 2.0 matrix walks through each step, and the ICRA Class Finder applies it to your project.

ICRA is not new. ASHE notes that “the first formal ICRA was introduced in the 1996 edition of the Facility Guidelines Institute’s Guidelines” (ASHE, April 20, 2022). FGI’s current editions are the 2026 FGI Codes, released August 31, 2026 (FGI). In short: credit CDC/HICPAC for the recommendation to perform an ICRA, ASHE for the 2.0 matrix, and FGI for building the ICRA requirement into design and construction.

Containment is what you build once that decision is made. Treat it as a system with five parts:

  • The envelope: barriers, doors, ceiling and floor seals, and every penetration through them.
  • The air: HVAC isolation inside the zone, negative pressure, HEPA filtration or outdoor exhaust, and verification that adjacent spaces still meet their design pressure relationships.
  • The path: the anteroom or entry, walk-off or adhesive mats, the worker clothing and shoe-cover rules, debris and material routes, and elevators.
  • The housekeeping: daily cleaning inside and outside the zone, covered waste, and wiping down tools.
  • The proof: permit, pressure records, inspection logs, breach reports, and the sign-off that ends or downgrades precautions.

Containment does not replace the ICRA itself, the life-safety review, or clinical surveillance. For the vocabulary, see ICRA: which one are you looking for? and ICRA meaning in healthcare construction. For how dust actually gets to patients, see how construction projects spread infections in hospitals and why Aspergillus is a construction risk.

From the ICRA 2.0 matrix to a containment package

The ASHE ICRA 2.0 Matrix of Precautions has four steps. You pick the activity type (A to D) from Table 1 and the highest patient risk group affected (Low, Medium, High, Highest) from Table 2. You read the class of precautions from Table 3. Then you assess the surrounding areas (below, above, lateral, behind, in front) in Table 4. Table 5 lists the minimum precautions before and during work, and Table 6 lists what has to happen when the work is complete.

ASHE ICRA 2.0, Table 3: class of precautions by patient risk group and project type
Patient risk groupType AType BType CType D
LowIIIIIIII*
MediumIIIIII*IV
HighIIIIIVV
HighestIIIIVVV

Source: ASHE ICRA 2.0 Matrix of Precautions for Construction, Renovation and Operations (copyright 2022 ASHE). The asterisk is explained in the next list.

Four rules on the matrix pages change the containment package, and teams often miss them:

  1. Permit trigger. An infection control permit and approval are required for Class III when the work is Type C, and for every Class IV or V job.
  2. Environmental hazards raise the class. Sewage, mold, asbestos, gray water, and black water require Class IV in Low and Medium risk groups and Class V in High and Highest, whatever the activity type. Pair this with the site’s guides on mold remediation containment and asbestos and lead abatement.
  3. The asterisk. Class III areas from Type C work in Medium risk or Type D work in Low risk that cannot be sealed and fully isolated from occupied patient-care space should be raised to include the Class IV negative air exhaust requirements.
  4. Surroundings can add controls. Table 4 has you consider noise, vibration, dust, ventilation, pressurization, vertical shafts, and elevators and stairs for each neighboring unit, along with impacts on data, mechanical, medical gas, and hot and cold water. Use the higher risk group if more than one is affected.

A wrinkle to settle in your policy: Table 5 says Class II “must never be used for construction or renovation activities.” Table 3, however, assigns Class II to Type B and Type C work in Low risk areas, and Type C includes single-room renovation and new drywall. Read literally, the two tables leave a Low-risk Type C renovation without a clear answer. Many programs settle this by applying at least Class III dust controls to any work that meets the Type C definition, wherever it is. Decide this in writing with infection prevention rather than leaving it to each project.

For a step-by-step walkthrough of the matrix, see how to use the ASHE ICRA 2.0 matrix and how to perform an ICRA before a renovation. For who signs, see who should be on the ICRA team and the infection preventionist’s role.

Who the barrier protects: aspergillosis and the severely immunocompromised patient. In a hospital, the people most at risk from construction dust are usually not the workers. They are the patients nearby. The Fungal Infection Trust, a UK charity (registered charity no. 1147658), says Aspergillus infections “can be fatal in people undergoing treatments for cancer, after transplant, and those whose immune system is suppressed for whatever reason, including steroid treatments” (Fungal Infection Trust). Its educational site, the Aspergillus Website, notes that “people with a healthy immune system have little to fear from inhaling the amounts of fungal spores normally present in the air” (Aspergillus Website, 2012).

The link to building work is well documented. The Aspergillus Website is funded by the Trust and maintained by a team at the University of Manchester (About the Aspergillus Website). It states: “It is widely accepted that invasive aspergillosis can be linked to demolition, excavation, construction and refurbishment activities within or close to hospital sites” (Aspergillus Website, 2016). The site also summarized a 2018 outbreak report from a Japanese haematology ward (Kaya et al., Internal Medicine, 2018): “In this case, a partition with sealed windows and HEPA filtration was built between the building works and the patient areas. After the outbreak a negative-pressure unit was added, which appeared to halt the outbreak. The authors note that ceiling demolition is a particularly risky activity as it produces a lot of dust” (Aspergillus Website, 2018).

What that means for the matrix. These are the patients the matrix’s higher risk groups exist to protect. It is why Type C and D work in High and Highest risk areas lands in Class IV or V. At those classes, ICRA 2.0 calls for:

  • critical barriers that meet NFPA 241 and reach the deck when ceiling tile is out
  • sealed penetrations
  • isolated return and supply diffusers
  • a negative airflow pattern from the entry, through the anteroom, into the work area
  • negative pressure across the whole workspace, held by HEPA exhaust air systems directed outdoors

If exhaust is directed indoors, it must be HEPA filtered, and the filtration must be verified by particulate measurement at no less than 99.97% efficiency before work starts (ASHE ICRA 2.0 matrix, PDF). CDC’s construction recommendations likewise ask for barriers that are “impermeable to fungal spores and in compliance with local fire codes” (CDC/HICPAC, 2003). The ceiling-demolition lesson is the reason above-ceiling access near these units needs its own controls. See ceiling access and penetrations and negative pressure and HEPA exhaust below, and our posts on Aspergillus risk during hospital construction and protecting immunocompromised patients during renovation.

Containment controls by class (I to V)

The table below condenses Table 5 of ASHE ICRA 2.0 into containment elements. “Policy” means ICRA 2.0 leaves the detail to the facility. Your permit should still make the choice explicit.

Containment elements by ICRA 2.0 class (condensed from ASHE ICRA 2.0 Table 5)
ElementClass IClass IIClass IIIClass IVClass V
Nature of workNon-invasive, no dust, not in occupied patient areasLimited-dust facilities work under standing precautions; never constructionActive dust preventionCritical barriers per NFPA 241Critical barriers per NFPA 241 plus anteroom
BarrierNone; replace displaced ceiling tilePer standing procedureHEPA vacuum, poly containment, or closed room door; seal doors with non-residue tapePlastic or hard, to ceiling or to deck if tile removed; affixed and secured; gaps tapedSame as Class IV, including anteroom barriers
Penetrationsn/an/aNot itemizedSeal all, including floor and ceiling; UL firestop where applicableSame, including anteroom
HVAC in zonen/aPolicyRemove or isolate return and supply diffusersSameSame
Pressuren/an/aIf contained: neutral to negative at all timesEntire zone negative; cascade from outside to insideSame
Exhaustn/an/aNot specified (see asterisk rule)HEPA exhaust directed outdoors; unfiltered allowed only 25 ft or more from entrances, intakes, windows; indoor discharge must be HEPA verified at 99.97% or better before work; no shared or recirculating systemsSame
Monitoringn/an/aNot specifiedDevice on containment exterior that monitors negative pressure continuously; visual indicator recommendedSame
Anteroomn/an/an/aAirflow must cascade from the entry point to the anteroom and into the work areaRequired; sized for staging, cart cleaning, workers; adjacent to entrance
Worker clothingn/an/an/aFree of visible dust on exit (HEPA vacuum or cover suits); shoe covers on entry, changed before leaving anteroomDisposable coveralls at all times, removed in anteroom; shoe covers as Class IV
Mats and wasten/an/aAdhesive mat per policy; hard-lidded, smooth, cleanable containers damp-wiped before leavingSameSame
Particulate datan/an/an/aConsider; may verify HEPA efficiencyConsider; may verify HEPA efficiency

Deeper class pages: ICRA Class III barrier requirements, Class IV construction barriers, and Class IV and Class V requirements.

Barrier types: soft, rigid, modular, and fire-rated

On barrier material, ASHE’s Class IV and V precautions do not ban plastic. They require that “all (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release,” with barriers meeting NFPA 241 (ASHE ICRA 2.0 matrix, PDF). See how that plays out by class in our matrix breakdown. Whatever the material, the barrier has to be fixed to floor and ceiling, protected from movement or damage, and sealed at the gaps. The CDC guideline is more prescriptive by duration. It says portable plastic enclosures with negative pressure and HEPA-filtered exhaust suit short, low-dust jobs such as above-ceiling cabling. Fire-resistant plastic curtains sealed ceiling to floor with overlapping sheets may be adequate for extensive but short-term work. Rigid noncombustible walls covered with sheet plastic are indicated for long-term projects that produce moderate to large amounts of dust.

Common barrier systems and where each fits
SystemTypical fitStrengthsWatch-outs
Closed room door plus taped sealsClass III small jobs in a room with a doorFast; no new constructionDoor undercut and frame leak; door must not be propped; supply diffusers can push the room positive
Portable containment cart or ECUAbove-ceiling access; ICRA 2.0 accepts approved units for Class IV in small areas fully enclosed by the unit with HEPA-filtered exhaustRepeatable, quick to deploy, small footprintSeal to ceiling grid; annual or policy-based filter and integrity checks; only covers the area under the unit
Fire-retardant poly on pole or zipper systemsClass III; short-duration Class IV where allowed by policyLow cost, fast, adaptableTears, billows under negative pressure, loses tape seal at floor and ceiling; check fire-retardant labeling and the duration your AHJ allows
Framed poly or poly over rigid frameMedium-duration Class III and IVStiffer than freestanding poly; holds pressure betterStill a soft skin; penetrations and corners leak
Modular rigid panel systemsClass IV and V, phased projects, high-traffic corridorsReusable; low dust on install and removal; better sound control; easier to hold pressureCheck the fire test data for the specific assembly; gaskets wear; doors and closers must be maintained
Gypsum board on studs (hard barrier)Long-duration Class IV and V; where a fire-rated or smoke-resisting temporary separation is requiredDurable, secure, can be built as a rated assemblyBuilding and demolishing it makes dust, so put up poly first and put it back up for removal; cutting drywall is prohibited during ICRA 2.0 removal

Decision rules that hold up in the field:

  • Pick the barrier for the longest phase it will see, not the first week. A curtain that holds on day one can billow and tear by week three of demolition.
  • If the barrier sits in a corridor that patients, carts, or beds will pass, assume impact and choose rigid.
  • If the barrier stands in for part of a required fire or smoke separation, or blocks or changes egress, life safety picks the material and rating first. Infection control then adds seals and pressure. Our fire rating for temporary construction barriers post covers the tiers.
  • Whatever the material, treat seams, corners, and the top and bottom tracks as the barrier. Most leaks happen there.

More detail: soft vs. hard containment barriers and polyethylene thickness for ICRA barriers.

Ceiling access, floor-to-deck, and MEP penetrations

Ceiling access

ICRA 2.0 defines Type A ceiling work narrowly: removing ceiling tile for visual inspection, limited to one tile per 50 square feet, with limited exposure time. Prolonged above-ceiling work, such as running conduit or cable, repairing firewalls and barriers, or accessing mechanical or electrical chases, is Type B. Opening a new cable pathway or doing invasive electrical work above ceilings is Type C. Class I requires any displaced tile to be replaced immediately before leaving or at the end of the work. The CDC guideline lists crawling into ceiling spaces in a way that may dislodge dust as an activity that needs a barrier. For major ceiling work in patient-care areas, it calls for plastic sheets or prefabricated plastic units with negative pressure, exhausting through a portable industrial-grade HEPA unit rated for 300 to 800 cfm or directly outdoors.

  • Use an above-ceiling permit that records the tile count, location, duration, and class.
  • Put a containment cart or tent under the opening for Type B work and above in patient areas.
  • HEPA vacuum tile tops and the grid around the opening before closing up.
  • Never leave open tiles overnight in a patient area.

Floor-to-deck

Class IV and V barriers must reach the ceiling, or the deck above when tile is removed. The CDC guideline goes further for rigid long-term barriers. It calls for running them floor to floor, which accounts for the space of roughly 2 to 8 feet above the lay-in ceiling. In practice, if the plenum above the work zone connects to occupied space, a barrier that stops at the grid does not contain the air. Air will travel over the top. Seal at the deck, around flutes in metal decking, and around everything passing through the plenum.

MEP penetrations

ICRA 2.0 requires sealing all penetrations in containment barriers, including floors and ceilings, using approved materials. It adds UL-listed firestop “if applicable for barrier type.” Two different reviews apply to one hole:

  • Infection control: is the hole airtight under negative pressure? Pipe, conduit, cable bundle, duct, and sprinkler drops all count.
  • Life safety: does the hole pass through a rated assembly, whether existing or temporary? If so, a listed firestop system for that assembly and penetrant is required, and it must be documented. A temporary penetration through an existing rated wall is a life-safety impairment until it is restored. Assess it under your ILSM policy.

Keep a penetration log for the containment: location, penetrant, seal or firestop system used, installer, date, and the date of re-inspection.

Anterooms and the entry path

ICRA 2.0 explicitly requires a constructed anteroom for Class V. It must be large enough for equipment staging, cart cleaning, and workers, and it must sit next to the entrance of the work area. The Class IV text requires the negative airflow pattern to run “from the entry point to the anteroom and into the construction area,” and requires shoe covers to be changed “prior to exiting the anteroom.” In other words, the Class IV text assumes there is an anteroom without spelling out how to build one. Many facility policies require an anteroom or vestibule for every Class IV job. Write your rule into the permit template so contractors are not left guessing.

What the anteroom has to do
FunctionPractical requirement
Pressure stepOccupied side, then anteroom, then work zone, each lower than the last; verify direction at both doors
DoffingRoom to remove Class V coveralls and change shoe covers without stepping back into the work zone; waste receptacle inside
Cart and tool cleaningSpace to damp-wipe carts, tools, and waste containers before they leave
Door disciplineSelf-closing doors; only one door open at a time; nothing propped open
Signage and recordsPermit posted; pressure display visible from outside; sign-in and inspection log
MatsAdhesive or walk-off mat sized so both feet contact it (the CDC guideline places tacky mats inside the construction zone at the entry)

Build details are in building an anteroom for healthcare construction.

Negative pressure, HVAC isolation, and HEPA exhaust

Isolate the HVAC first

ICRA 2.0 Classes III to V require removing or isolating return diffusers, so dust does not enter the building system, and supply diffusers, so the space does not go positive. The CDC guideline adds two steps. Make sure the air-handling system in the affected area is working properly after the barriers go up and before the area is set to negative pressure. When vibration work could dislodge dust in ductwork serving occupied spaces, or when that ductwork is modified, temporarily filter the supply grilles. Coordinate with controls staff. Capping diffusers changes static pressure in the duct system and can move air balance in nearby rooms, including rooms with design pressure relationships under ASHRAE 170.

Route the exhaust

  • Outdoors, 25 ft or more from entrances, air intakes, and windows: ICRA 2.0 does not require HEPA filtration on this stream.
  • Indoors: must be HEPA filtered. Before work starts, filtration must be verified by particulate measurement as no less than 99.97% efficient, and it must not change airflow or pressure relationships in other areas.
  • Never into shared or recirculating HVAC, or shared exhaust such as bathroom exhaust.
  • The CDC guideline notes window chutes for large debris are acceptable only while the negative pressure differential is maintained. It also recommends sealing work-zone windows where practical.

Size the machines

Neither ICRA 2.0 nor the CDC guideline sets a construction-zone air change rate. Size the equipment so it holds the target differential with the barrier you actually built, after allowing for leakage and duct losses. A working approach engineers use:

  1. Start from zone volume and a design air change rate set in your ICRA plan (for example, the value your engineer or policy chooses). Required flow in cfm equals volume in cubic feet times air changes per hour, divided by 60.
  2. Add margin for leakage. Soft barriers leak more than gasketed rigid panels.
  3. Derate for flexible duct runs and loaded filters, and confirm actual flow at the discharge, not just the nameplate.
  4. Verify with the differential reading, not the calculation.

HEPA machine operations

  • Check pre-filters at start-up every shift. Loaded pre-filters cut airflow and pressure.
  • Bag spent filters before transport. The CDC guideline says to bag old filters before moving them.
  • Keep negative air running after dust-producing work ends and before critical barriers come down. ICRA 2.0 Table 6 requires this.
  • Plan power so machines are not on circuits that will be shut down. Put machines on emergency power if your ICRA calls for it.

Why the pressure matters beyond the zone: the CDC guideline describes an aspergillosis outbreak among oncology patients that was traced to depressurization of the building housing the HSCT unit during construction in an adjacent building. Pressure readings there ranged from 0.1 to 5.8 Pa, and unfiltered outdoor air entered through doors and windows. Containment design has to account for the building pressure balance as well as the box. See negative air pressure in hospital construction and HEPA-filtered negative air machines. For design-side ventilation context, see ASHRAE 170 ventilation, pressure, and air changes and how ASHRAE 170 interacts with FGI.

Pressure monitoring: what is required and what is practice

What ICRA 2.0 requires: for Class IV and V, a device on the exterior of the containment that continuously monitors negative pressure. A visual pressure indicator is recommended so anyone can see the pressure is being held. For Class III, the contained area must be neutral to negative at all times.

What CDC says: create and maintain negative pressure in work zones next to patient-care areas, monitor negative airflow inside rigid barriers, and monitor the construction area daily for compliance with the infection-control plan. CDC also recommends daily monitoring and documentation of negative airflow in airborne infection isolation rooms and of positive airflow in protective environment rooms near construction.

What neither sets: a numeric minimum differential for construction containment. The 2.5 Pa (0.01 in. w.c.) figure that appears in many hospital construction policies comes from CDC’s design values for AII and protective environment rooms, not from a construction requirement in the CDC guideline or ICRA 2.0. Vendor and trade articles that cite a single “required” construction number, such as minus 0.03 in. w.c. “per FGI and ICRA 2.0”, are not supported by the ICRA 2.0 tool text. Put your set point and alarm threshold in the ICRA permit, and have engineering and infection prevention sign it.

Monitoring methods compared
MethodWhat it provesBest useLimits
Digital recording manometer with alarmContinuous differential, with a time-stamped recordClass IV and V primary device; after-hours alertingNeeds calibration, a correctly placed reference tube, and someone who answers the alarm
Analog differential gaugeInstant differential at a glanceVisual indicator at the entrance; backupNo record unless someone logs it
Smoke tube or tissue test at door gapsDirection of airflow at one point and one momentDaily spot checks; locating leaksNot a measurement; door opening skews it
Ball or flutter indicatorDirection onlyLow-cost visual cue for staffNo magnitude; easily ignored
Particle counts at barrier perimeterWhether particles are escaping; HEPA efficiencyVerifying barrier integrity (CDC Category II); HEPA verification before indoor dischargeNeeds a baseline or comparison area to interpret
  • Measure between the work zone and the space you are protecting, usually the corridor or the anteroom. Record which pair the reading represents.
  • Zero and calibrate per the manufacturer and your policy, and keep the records with the project file.
  • Decide in advance who receives after-hours alarms and how quickly someone must respond. A data log nobody reads protects no one.
  • If a protective environment or AII room is nearby, trend that room’s pressure for the length of the project too.

Setup and records: monitoring pressure differentials during hospital construction. AII context: ASHRAE 170 requirements for AII rooms.

Ventilation Monitoring Protocols: Intake Positioning, Filter Maintenance, and Protected Environments

Achieving effective containment during healthcare renovation relies on rigorous ventilation engineering controls and documented monitoring protocols. In alignment with CDC environmental infection-control guidelines, ANSI/ASHRAE/ASHE Standard 170-2021, and ASHE ICRA 2.0 standards, facilities must implement specific safeguards governing pressure relationship logging, outside air intake separation, staged filtration maintenance, and clinical area protection.

Continuous Pressure Relationship Documentation and Logging

For Class IV and Class V containment zones, maintaining negative pressure is a life-safety requirement that demands verifiable documentation rather than assumptions:

  • Continuous Electronic Monitoring: Install a continuous digital differential pressure monitor mounted on the exterior wall of the containment barrier adjacent to the primary entrance. The monitor must feature an easy-to-read visual display, continuous digital data logging with date/time stamps, and audible/visual alarms calibrated to trigger when pressure differential drops below the required threshold (minimum −0.020" w.g. / −2.5 Pa relative to adjacent occupied areas).
  • Daily Calibration and Physical Verification: At least once per shift (twice daily), facilities personnel or the designated ICRA monitor must verify electronic gauge accuracy using a visual smoke-tube test or a calibrated handheld digital micromanometer at the base of the door or entry threshold. Every verification must be recorded in the official project compliance logbook.
  • Electronic Audit Trail: Maintain digital data files or pressure chart recordings as part of the permanent project compliance file. Surveyors from The Joint Commission (Environment of Care Standard EC.02.06.05) and CMS routinely inspect these records to verify unbroken negative pressure containment.

Building Outdoor Air Intake (OAI) Safeguards and Intake Positioning

Discharging HEPA-filtered negative air machines and managing exterior dust requires strict adherence to outdoor air intake clearances:

  • Minimum 25-Foot Clearance: Under ANSI/ASHRAE/ASHE Standard 170-2021 Section 6.3.2, exhaust discharged from negative air machines or construction containment to the exterior must terminate at least 25 feet away from any building outdoor air intake, operable window, public entrance, or louvered ventilation opening. Exhaust flues must be directed away from prevailing wind vectors toward intakes to prevent contaminant re-entrainment.
  • Intake Pre-Filtration During Exterior Work: During site excavation, masonry cutting, exterior demolition, or roofing work, external dust plumes can overwhelm permanent building HVAC filtration. Facilities engineering must inspect outdoor air intakes (OAIs) facing the construction footprint and install temporary MERV 8 or MERV 11 pre-filters over intake louvers to protect primary air handling units (AHUs) from excessive particulate loading.
  • Ductwork Sealing within the Work Zone: Before initiating demolition or particulate-generating activity, all HVAC supply, return, and exhaust grilles within the containment perimeter must be sealed airtight with 6-mil polyethylene sheeting and industrial-grade duct tape. This isolates the zone from the central ventilation system and prevents contamination of central ductwork.

Staged Filter Maintenance for Negative Air Machines

HEPA-filtered negative air machines (NAMs) rely on multi-stage filtration to maintain airflow capacity and ensure 99.97% particle capture efficiency at 0.3 µm:

  • Stage 1 (Coarse Pre-Filter): Replace coarse fibrous pre-filters daily during heavy dust generation (demolition, drywall sanding) and at least weekly during light construction. This preserves secondary filters and maintains design CFM.
  • Stage 2 (Secondary Pleated Filter): Inspect intermediate pleated filters (MERV 8 to MERV 13) weekly and replace every 1 to 2 weeks, or whenever differential pressure indicates loading.
  • Stage 3 (Certified True HEPA Filter): HEPA filters must be certified factory-tested to capture 99.97% of particulates ≥ 0.3 µm. On critical healthcare projects, units should undergo on-site challenge testing (DOP or PAO aerosol photometer testing) upon installation or relocation to verify gasket integrity and filter seal.
  • Magnehelic Differential Pressure Gauge Monitoring: Monitor the differential pressure (ΔP) gauge mounted on each negative air machine daily. When ΔP across the HEPA filter exceeds the manufacturer’s maximum operating threshold (typically 1.0 to 1.5 in. w.g. above initial clean-filter baseline), the unit cannot maintain rated CFM and the HEPA filter must be replaced.
  • Safe Filter Replacement Protocol: Filter changeouts must occur inside the containment zone while the machine is running on low speed or immediately bagged in 6-mil poly and sealed with tape to prevent releasing collected fungal spores into ambient air.

Monitoring Actions in Protected Patient-Care Environments

When renovation occurs adjacent to, above, or below high-risk clinical areas—such as Protective Environments (PE rooms), bone marrow transplant units, oncology wards, neonatal intensive care units (NICUs), and operating rooms—enhanced safeguards are required:

  • Positive Pressure Verification in PE Rooms: Protective Environment rooms must maintain continuous POSITIVE pressure (≥ +0.01 to +0.03" w.g. / +2.5 Pa) relative to the corridor. Facility staff must log differential pressure daily at the room’s continuous monitor to ensure that construction-induced pressure fluctuations never invert the room’s positive protective envelope.
  • Optical Particle Counter (OPC) Surveillance: Deploy calibrated optical particle counters in clean corridors immediately outside the containment barrier and within adjacent clinical units. Particle counts for 0.5 µm and 5.0 µm size channels must be logged at least twice weekly. Any sudden spike in particle concentration indicates an undetected barrier breach or pressure loss requiring immediate investigation.
  • Clinical Communication and Emergency Shutdown Interlocks: Establish direct communication channels between the facilities construction lead and nurse managers in adjacent high-risk units. In the event of catastrophic barrier failure, HVAC disruption, or significant dust track-out, work must halt immediately and clinical staff must be alerted to verify patient protection.

Dust control, walk-off mats, debris, and traffic

The barrier contains dust, and dust control keeps the barrier from being overwhelmed. The CDC guideline’s construction table and its numbered recommendations give the operational core:

  • Mats: tacky or adhesive mats inside the entrance, big enough that both feet land on them. ICRA 2.0 requires an adhesive mat at the entrance of contained work areas per facility policy, changed routinely and when visibly soiled. Keep a separate walk-off mat on the clean side if your policy calls for one.
  • Cleaning: clean the work zone and its entrances daily or more often. Wet mop, or HEPA vacuum carpeted areas daily. Outside non-contained areas, ICRA 2.0 calls for damp mopping or HEPA vacuuming.
  • Tools and carts: damp-wipe before they leave the zone.
  • Debris: keep it contained in the work area. Move it in smooth, hard-lidded containers damp-wiped before they leave. Mist and cover debris carts. Schedule removal for times when patient exposure is lowest, and use a designated route.
  • Traffic: designated construction entrances, corridors, and elevators where practical. Do not transport patients on the same elevator with construction materials and debris. Provide essential services (such as toilets) inside the zone on long projects to cut traffic.
  • Clothing: protective outer clothing comes off before entering clean areas. ICRA 2.0 Class IV allows HEPA vacuuming or cover suits, and Class V requires disposable coveralls.
  • Moisture: store materials dry, do not install wet porous materials, and replace water-damaged porous materials that cannot be dried within 72 hours.
  • Laboratories: the CDC guideline cites pseudo-outbreaks traced to construction dust near labs and blood culture storage. Treat labs, pharmacy compounding, and sterile storage next to a project as protected spaces in Table 4.

The ICRA 2.0 matrix also lists noise and vibration strategies that double as dust strategies: wet core drilling instead of dry or percussion, wet diamond saws instead of jackhammering, beam clamps instead of powder-actuated fasteners, HEPA vacuums instead of standard wet/dry vacuums, and prefabrication where possible.

Utility shutdowns and system impacts

Table 4 of ICRA 2.0 requires you to identify impacts on data, mechanical, medical gases, and hot and cold water for every surrounding unit. Its mitigation strategies are to schedule outages, provide temporary systems, and back-feed electricity or medical gases. Fan shutdown and startup are listed as Type B activities in their own right. A short HVAC outage near a high-risk unit therefore needs its own ICRA, not just a maintenance ticket.

Utility events and the containment questions they raise
EventContainment questionTypical controls
AHU or exhaust fan shutdownWill adjacent protective rooms lose pressure? Will the zone go positive?Schedule with affected units; temporary exhaust; trend pressures; restart sequence verified
Ductwork tie-in or modificationWill dust shake loose into occupied supply?Temporary supply-grille filters (CDC); isolate branches; clean before reconnecting
Domestic water shutdown or tie-inStagnation, sediment, and waterborne pathogen risk on restartFlush per facility procedure after work (CDC); coordinate with water management program
Medical gas outagePatient safety and verification on restorationBack-feed or temporary supply; verification per NFPA 99 program before return to service
Fire alarm or sprinkler impairmentLife safety, not infection control, governs, but barrier and egress changes interactILSM assessment, fire watch per policy, notifications (see next section)
Electrical outage affecting negative air machinesContainment loses pressure silentlyMachines on circuits outside the outage scope; alarm; work stops if pressure is lost

Water-side risks: water system risks during healthcare construction, ASHRAE 188 water management plan requirements, and Legionella water management programs. Medical gas: medical gas systems under NFPA 99. Downtime planning: reducing downtime across critical systems.

Sterile processing and surgical suites. ICRA 2.0 places the clean side of sterile processing, OR theaters and restricted areas, procedural suites, and pharmacy compounding in the Highest risk group. The dirty side of SPD is Medium. Work near the clean side or sterile storage usually lands in Class IV or V, and utility outages there can affect steam, water quality, humidity, and pressure. See sterile processing and AAMI ST79, operating room HVAC, and filtration for surgical suites under ASHRAE 170.

ILSM and life-safety overlap

In an occupied hospital, every containment barrier is also a life-safety question. Barriers can block exits, lengthen travel distance, hide fire extinguishers and pull stations, interrupt smoke compartments, or add combustible material. ICRA 2.0 itself ties Class IV and V critical barriers to NFPA 241, the Standard for Safeguarding Construction, Alteration, and Demolition Operations.

Regulatory frame. CMS requires hospitals to meet the Life Safety Code (NFPA 101, 2012 edition, with listed TIAs) under 42 CFR 482.41(b). Federal regulations don’t use the term “ICRA.” The hospital infection-control Condition of Participation requires programs that “demonstrate adherence to nationally recognized infection prevention and control guidelines” (42 CFR 482.42). Under the Joint Commission’s Accreditation 360 hospital manual, effective January 1, 2026, the former Environment of Care and Life Safety chapters were combined into a Physical Environment (PE) chapter. Interim life safety measures now sit at PE.03.02.01 (formerly LS.01.02.01), which covers protecting occupants when the Life Safety Code is not met or during construction. Building safety and facility management, including Health Care Facilities Code expectations, sits at PE.04.01.01. ICRA itself stays an infection prevention and control obligation, separate from PE. For the chapter-level picture, see Accreditation 360: the 2026 Physical Environment standards. For the federal side, see CMS CoP environment of care requirements.

One barrier, two reviews
Barrier decisionInfection control asksLife safety asks
Barrier locationDoes it fully separate the dusty zone from patients and intakes?Does it block or reduce exit access, exits, or corridor width? Are alternate routes signed?
MaterialWill it hold a seal under negative pressure for the project duration?Is it noncombustible or flame-resistant as required? Does it need a fire-resistance or smoke-resisting rating where it replaces a separation?
DoorsSelf-closing, sealed, one-at-a-time in the anteroomSwing, latching, hardware, and egress function; not locked against required egress
PenetrationsAirtightListed firestop where rated; impairment logged until restored
Ceiling openingsBarrier to deck; plenum sealedSmoke barrier continuity above the ceiling; sprinkler coverage and obstruction
Negative air ductingExhaust route and HEPA statusDucts through rated walls, doors held open by ducts, and exit obstruction

Run the ILSM assessment and the ICRA from the same drawings and keep them in the same packet. The site’s ILSM series goes deeper: what ILSM are, when ILSM are required, ILSM on small projects, documenting ILSM, who is responsible for ILSM, ILSM and the fire safety plan, ILSM staff training, how long ILSM stay in effect, and common ILSM deficiencies. For the side-by-side, see ILSM vs. ICRA in healthcare construction. For the code background, see NFPA 241 and healthcare construction, the NFPA 101 Life Safety Code guide for healthcare, and defend-in-place strategy.

Fire alarm and sprinkler outages: two different clocks. Utility shutdowns, tie-ins, and above-ceiling work often impair fire protection while containment is up. CMS’s fire safety survey report for hospitals, Form CMS-2786R, sets the fire alarm threshold at tag K346: “Where required fire alarm system is out of services for more than 4 hours in a 24 hour period, the authority having jurisdiction shall be notified, and the building shall be evacuated or an approved fire watch shall be provided for all parties left unprotected by the shutdown until the fire alarm system has been returned to service” (Form CMS-2786R (07/2018), K346, page 22).

For sprinklers, the hospital Condition of Participation states: “When a sprinkler system is shut down for more than 10 hours, the hospital must: (i) Evacuate the building or portion of the building affected by the system outage until the system is back in service, or (ii) Establish a fire watch until the system is back in service” (42 CFR 482.41(b)(8)). The same form carries the sprinkler outage rule at tag K354 (Form CMS-2786R, K354, page 24). Put the impairment start time, the authority notification, any fire watch log, and the ILSM assessment in the same packet as the ICRA permit. That way a shutdown that runs long does not cross a threshold unnoticed.

Trade reading (not a primary source): Life Safety Express, a healthcare life-safety consultancy in Gallatin, Tennessee, adds two field cautions.

  • A short outage still needs a risk assessment. “Facilities should not treat four hours as a permission to ignore a shorter shutdown; risk assessment, notification, and temporary measures can be necessary immediately based on the condition.”
  • A fire watch is not the same as an ILSM. “A fire watch is a specific temporary compensatory measure involving assigned personnel and an approved procedure.” And: “A fire watch may be one action within a larger interim plan, but completing an ILSM form does not by itself satisfy a required fire watch.”

Source: Life Safety Express, “Temporary Fire Protection Impairments: Fire Watch Requirements and ILSM Decision Paths” (2026).

Daily monitoring and breach response

The CDC guideline calls for monitoring the construction area daily for compliance with the infection-control plan. It also calls for monitoring barriers, repairing gaps or breaks in barrier joints, and building infection-control adherence into construction contracts, with penalties for noncompliance and ways to make sure problems get corrected promptly. ICRA 2.0 leaves the inspection frequency to the facility. A workable split:

Who checks what, and how often (example program; set yours in policy)
RoleFrequencyFocus
Contractor superintendent or foremanStart of each shift and end of dayBarrier, pressure reading, machines, mats, doors, housekeeping; log entry
Facilities or project managerDaily for Class IV and V; per policy for Class IIILog review, HVAC isolation, exhaust route, penetrations, ILSM items
Infection preventionist or designeePer permit (commonly at start-up, then on a set cadence, and after any breach)Containment integrity, clinical-side dust, adjacent unit concerns, surveillance signals
Clinical unit leadersOngoingReport dust, odors, noise, door propping, or pressure alarms

Breach response sequence:

  1. Stop dust-producing work in the affected zone.
  2. Restore the seal or pressure, and find the cause (torn poly, propped door, loaded filter, power loss, HVAC change).
  3. Clean outside the barrier as far as dust may have traveled, using HEPA vacuuming and damp wiping.
  4. Notify infection prevention and the affected unit. Decide with the IP whether to relocate patients, check pressures in nearby protective rooms, or add particle counts.
  5. Document the time found, duration, cause, actions, and who approved restarting.
  6. If a healthcare-associated aspergillosis or other airborne fungal case occurs during or right after construction, the CDC guideline recommends reviewing the pressure differential records for the construction zone and protective environment rooms and correcting the engineering problems. The logs are evidence, so keep them.

Cadence by class: how often ICRA monitoring should be done. Rounding practice: environment of care rounds and corrective action.

Checklists: pre-construction, daily, teardown, sign-off

Pre-construction checklist

  • ICRA completed on the current ASHE ICRA 2.0 tool: activity type, highest patient risk group, class, Table 4 surrounding-area assessment.
  • Environmental hazards checked (mold, asbestos, sewage, gray and black water), with the class raised if present.
  • Asterisk rule applied for Class III areas that cannot be sealed from patient space.
  • Permit signed by infection prevention and facilities (required for Class III Type C, IV, and V).
  • ILSM assessment completed on the same drawings, with measures listed.
  • Barrier material, rating, and drawings approved, including anteroom layout, doors, and egress changes.
  • HVAC isolation plan: which supply and return diffusers are capped, and whether adjacent space balance is checked.
  • Exhaust route chosen: outdoors at 25 ft or more from openings, or HEPA indoors with pre-start particle verification.
  • Pressure set point, alarm threshold, monitoring device, after-hours alert recipient, and response time written into the permit.
  • Utility outages identified and scheduled with affected units, with temporary systems arranged.
  • Traffic routes, construction elevator, debris route and times, and worker entrance designated.
  • Patients in high-risk adjacent rooms assessed for relocation (CDC). Unit staff briefed.
  • Contractor and staff education done. Infection-control adherence clause is in the contract.
  • Baseline readings recorded: adjacent protective room pressures, and particle counts if your program uses them.
  • Barrier built without releasing dust, inspected, and pressure verified before any dust-producing work begins.

Daily inspection checklist

  • Permit and class posted and current. Scope has not grown beyond the permit.
  • Barrier intact: no tears, gaps, or loose tape at floor, ceiling, seams, corners. Rigid panels and gaskets seated.
  • Barrier continuous to the deck where tile is removed. Plenum openings sealed.
  • Penetrations sealed. New penetrations logged.
  • Doors self-close and latch, nothing propped, one anteroom door open at a time.
  • Pressure display reading within set point. Log reviewed for overnight excursions. Alarm tested per policy.
  • Airflow direction confirmed at doors with a smoke tube or tissue.
  • Negative air machines running, pre-filters acceptable, ducting intact, discharge at the approved location.
  • Supply and return diffusers in zone still capped.
  • Adhesive mats clean and changed when soiled.
  • Housekeeping: inside zone cleaned, corridor outside clean, no tracking.
  • Debris contained, carts covered, containers damp-wiped before leaving.
  • Workers following clothing and shoe-cover rules for the class.
  • ILSM items in place: exits clear, alternate routes signed, extinguishers accessible, fire watch if required.
  • Any breach or complaint documented with corrective action.

Barrier teardown and cleaning checklist (from ICRA 2.0 Table 6 and CDC)

  • All drywall removal, dust-producing work, and anything beyond simple touch-up is finished. Barriers stay up until then.
  • Work area cleaned: all environmental surfaces, high horizontal surfaces, and flooring. Supply and return registers checked for dust.
  • Negative air kept running for a period after dust-producing work ends and before critical barriers are removed.
  • Visible mold checked for and eliminated if present (CDC).
  • For rigid barriers: barrier curtains in place to contain dust before removal (CDC). Screws and painter tape removed carefully. Hand-held HEPA vacuum used where screw removal raises dust. No drywall cutting during removal. Stud tracks HEPA vacuumed before the outer hard barrier comes down. Plastic enclosure used if dust could be generated.
  • Area cleaned again of any dust generated during removal.
  • HVAC isolation removed after the critical barriers come down. Filters cleaned or replaced with dust containment. Spent filters bagged.
  • Water system flushed where lines were affected (CDC).

Sign-off checklist

  • Class III (Type C only), IV, and V: area inspected by an infection preventionist or designee and an engineering representative before precautions are discontinued or downgraded (ICRA 2.0 Table 6). Inspection documented.
  • HVAC verified clean and operational and meeting original airflow and air exchange design specifications (ICRA 2.0 Table 6). Appropriate ACH, humidity, and pressure differentials restored (CDC).
  • For ORs and protective environments: designed air balance achieved and space commissioned before occupancy (CDC).
  • Fire and smoke separations restored, penetrations firestopped, ILSM closed out and documented.
  • Environmental services terminal clean completed before patients return.
  • Project file closed out: permit, pressure logs, inspection logs, breach reports, HEPA verification, penetration log, sign-offs.

Cleaning standards: terminal cleaning protocols. Commissioning: HVAC commissioning, testing, and balancing.

ASHE ICRA 2.0 & CDC Compliance

Put These Containment Checklists to Work on Your Site

During an unannounced Joint Commission Life Safety survey or CMS audit, surveyors demand daily containment inspection logs, continuous negative pressure records, and permit sign-offs for every active barrier. A single missing day triggers a direct Requirement for Improvement (RFI).

📋

What’s In The Toolkit:

• Pre-Construction Permit: 15-gate checklist.
• Table 4 Surroundings Sheet: Spatial assessment.
• Daily Shift Rounds Log: Pressure & HEPA checks.
• Breach & Teardown Forms: 99.97% HEPA proof.
• AI Copilot Routines: 5 automated workflows ($17).
Secure 1-Click Square Checkout

Infection prevention during renovation: the clinical side

A tight barrier does not finish the job. The CDC guideline’s construction recommendations reach into clinical practice. Its points, in plain terms:

  • Multidisciplinary team from the start. Include infection control staff in coordinating demolition, construction, and renovation, and keep a record of the team’s activities.
  • Education both ways. Teach the construction team and staff in immunocompromised care areas about airborne infection risks from construction, how fungal spores spread, and how to control them.
  • Surveillance. Establish surveillance for airborne environmental disease such as aspergillosis during construction, including active surveillance in immunocompromised patients and periodic review of microbiology, histopathology, and postmortem data. CDC makes no recommendation for routine microbiologic air sampling before, during, or after construction. It lists that as unresolved.
  • Relocation decisions. Relocate patients whose rooms are adjacent to work zones depending on immune status, project scope, and dust or water aerosol potential. CDC notes N95 respirators were well tolerated by patients in one outbreak response but says routine patient respirator use remains unresolved.
  • External work counts. For outdoor demolition and excavation: decide whether the facility can temporarily run on recirculated air and seal nearby intakes. If not, check and change roughing filters more often. Seal windows and reduce outside-air entry, especially in protective environment areas.

Related: protecting immunocompromised patients during renovation, should patients be relocated?, communicating construction risks to clinical staff, coordinating clinical and facility teams, how FGI affects renovation projects, and the infection control professional guide. For survey context, see how The Joint Commission surveys infection control.

Where containment fails in the field

Common failure points and the fix
FailureWhy it happensFix
Barrier stops at the ceiling gridPlenum not considered; tiles removed laterBarrier to deck at setup whenever tiles may come out; re-check when scope changes
Zone goes neutral or positiveSupply diffuser left open; door propped; loaded pre-filter; power lost to machineCap supply; door closers; filter checks each shift; alarmed monitor with a named responder
Adjacent protective room loses pressureBuilding balance shifted by capped ducts or extra exhaustTrend protective rooms during the project; coordinate with controls before changes
Soft barrier fails mid-projectChosen for week one, not the demolition phaseSelect for the worst phase; upgrade to rigid when the class or duration grows
Dust track-out in corridorMats too small or not changed; shoe covers not changed in anteroomMats sized for both feet; change schedule; anteroom discipline
Dust release at teardownBarriers removed before cleaning; drywall cut during removalFollow ICRA 2.0 Table 6 sequence; IP and engineering sign-off first
Penetration left open after trades leaveNo penetration log; firestop not in scopePenetration log; daily check; firestop in contract
Permit no longer matches the workScope crept into another room or onto another unitReassess and re-permit; ICRA class follows the actual work

Products and systems (not endorsements)

The companies and resources below are listed for information only. They are not endorsements, Healthcare Facility Hub has no affiliation with them, and performance statements are each company’s own claims. ASHE does not certify products against ICRA 2.0. The project’s ICRA team decides whether an installed system meets the precautions for its class.

Rapid Room: a reusable, tool-free temporary wall system for occupied healthcare renovation, made by Imperial Privacy Systems in Pompano Beach, Florida. The company says it installs three times faster than drywall and offers an optional cloud-connected differential-pressure monitor that logs readings and sends alerts. It sells the system outright or rents it. rapidroom.com

STARC Systems: reusable modular containment walls in four lines (RealWall, LiteBarrier, FireblockWall, StackBarrier). The company says FireblockWall is listed by Intertek to ASTM E119 for a one-hour rating. The company says two workers can install about 100 feet of RealWall in an hour, and it publishes healthcare case studies, including Abbott Northwestern Hospital. STARC FireblockWall

Construction Containment Services (5DCCS): a San Jose, California subcontractor founded in 2024 that rents, installs, and removes modular containment walls across the Bay Area and Northern California. The company says it is a service-disabled veteran-owned small business, and federal contractor registration data list it that way. The company says it also holds California DVBE certification and supports VA medical center projects. 5DCCS healthcare containment

Healthcare Facilities Today: a trade publication from Trade Press Media Group covering healthcare facility management, design, and construction. It is a useful source for project news and operations articles. healthcarefacilitiestoday.com

Facility Guidelines Institute (FGI): the not-for-profit that develops the FGI Codes used by many states for healthcare design and construction. The 2026 FGI Codes and companion Handbooks were released August 31, 2026. FGI

FAQ

What is healthcare construction containment?

Healthcare construction containment is the set of barriers, airflow controls, entry procedures, cleaning, and records that keep construction dust and contaminated air inside a work zone in an occupied healthcare facility. The CDC/HICPAC Guidelines for Environmental Infection Control in Health-Care Facilities (2003), Part II tell facilities to construct barriers that keep construction dust out of patient-care areas. An infection control risk assessment (ICRA) sets the class of precautions; containment is how that class is built and maintained.

Which ICRA classes require negative pressure?

Under ASHE ICRA 2.0 (2022), Table 5, Class IV and Class V require the entire construction area to remain negatively pressurized, with airflow cascading from outside to inside. Class III requires a contained work area to be neutral to negative at all times. A note to Table 3 adds that Class III areas from Medium-risk Type C or Low-risk Type D work that cannot be sealed from occupied patient space should add the Class IV negative air exhaust requirements.

Is there a required pressure number for construction containment?

No. ASHE ICRA 2.0 (2022), Table 5 sets no numeric pressure for construction containment. For Class IV and V it requires a device on the outside of the containment that continually monitors negative pressurization, and recommends a visual pressure indicator. The 2.5 Pa (0.01 in. w.c.) value in the CDC/HICPAC Guidelines for Environmental Infection Control (2003) is a design value for isolation and protective environment rooms, not a construction requirement. Record your set point and alarm threshold in the ICRA permit.

Does Class IV require an anteroom?

ASHE ICRA 2.0 (2022), Table 5 explicitly requires a constructed anteroom only for Class V, built next to the work-area entrance and large enough for equipment staging, cart cleaning, and workers. The Class IV precautions still assume one: negative airflow must run from the entry point to the anteroom and into the construction area, and shoe covers must be changed before exiting the anteroom. Write your facility’s Class IV anteroom rule into policy.

Can plastic sheeting be used for Class IV or V?

Yes. ASHE ICRA 2.0 (2022), Table 5 allows plastic or hard barriers for Class IV and V if construction prevents dust release, plastic is affixed to floor and ceiling and secured from movement or damage, gaps are sealed with residue-free tape, and barriers meet NFPA 241. Separately, the CDC/HICPAC Guidelines for Environmental Infection Control (2003), Table 9, recommend durable rigid barriers for ongoing, long-term projects. Check your accreditor’s and authority having jurisdiction’s fire requirements for plastic barriers.

Where should HEPA exhaust go?

Outdoors, by preference. For Class IV and V, ASHE ICRA 2.0 (2022), Table 5 calls for HEPA exhaust directed outdoors, and exhaust discharged directly outdoors 25 feet or more from entrances, air intakes, and windows does not need HEPA filtration. Exhaust directed indoors must be HEPA filtered and verified by particulate measurement at no less than 99.97 percent efficiency before work starts. Exhaust into shared or recirculating HVAC or other shared exhaust systems is not acceptable.

How often should containment be inspected?

Daily, at minimum, under CDC guidance. The CDC/HICPAC Guidelines for Environmental Infection Control in Health-Care Facilities (2003), Table 9 say to monitor the construction area daily for compliance with the infection-control plan, and CDC also recommends monitoring barriers and repairing gaps in barrier joints. ASHE ICRA 2.0 (2022) sets no inspection frequency, so set the cadence, and who inspects, in the ICRA permit and facility policy.

Who can take containment down?

For Class III (Type C activities only), IV, and V, ASHE ICRA 2.0 (2022), Table 6 requires an infection preventionist or designee and an engineering representative to inspect the area, with documentation, before precautions are discontinued or downgraded. Critical barriers may not come down until the work area has been cleaned, and negative air devices must keep running after dust-creating work ends and until the critical barriers are removed.

How do ILSM and ICRA interact on the same barrier?

They are two separate reviews of one barrier. The ICRA sets dust and pressure controls. For Joint Commission-accredited hospitals, interim life safety measures fall under PE.03.02.01, which the Joint Commission Accreditation 360 Physical Environment webinar transcript (2025) describes as protecting occupants when the Life Safety Code is not met or during construction. Review both on the same drawings, because barrier location, material, doors, and penetrations matter to both.

Does a utility shutdown need an ICRA?

Often, yes. ASHE ICRA 2.0 (2022), Table 1 lists fan shutdown and startup as a Type B activity, so an HVAC outage near patient areas needs its own risk assessment and class. Table 4 of ICRA 2.0 also asks the team to identify impacts on data, mechanical, medical gas, and hot and cold water systems serving surrounding units, with mitigations such as scheduled outages and temporary systems.

Equip Your Facility with Professional Containment Tools

Choose the compliance tier that matches your facility’s active healthcare renovation or barrier needs:

Free Field Summary

Containment Quick-Reference Card

2-page quick reference summarizing Class I–V decision matrix, asterisk raise rule, 5 containment elements, and daily check essentials.

FREE direct download
  • ASHE ICRA 2.0 Table 3 Matrix
  • Activity Types A–D × Risk Groups
  • The 4 Mandatory Matrix Rules
  • 5 Core Containment Elements
  • 6-Step Breach Response Sequence
  • Print-Ready A4 PDF
Download Free PDF
Working Pack

Containment Permit & Checks Pack

Printable and fillable working logs, checklists, and notification records for facility directors, infection preventionists, and general contractors.

$7.00 one-time
  • Pre-Construction Permit Packet (15 Gates)
  • Table 4 Surroundings Assessment Sheet
  • Multi-Shift Daily Monitoring Log
  • Breach Incident Response Log
  • Teardown & Commissioning Sign-Off
  • Instant Delivery Page Access
Buy Permit & Checks Pack ($7) →
AI Operating System

Containment Copilot

The intensive AI version: drop into ChatGPT or Claude to run interactive assessments, generate containment specs, audit logs, and prep for surveys.

$17.00 one-time
  • 5 Executable AI Routines (/class, /package…)
  • Embedded Command Router
  • Pre-Mobilization 15-Gate Scorer
  • Daily Shift Log & Pressure Auditor
  • Tripartite Commissioning Generator
  • Instant Delivery Page Access
Buy Containment Copilot ($17) →

All payments securely processed by Square • Corporate Purchasing Cards (P-Cards), Apple Pay & Google Pay Accepted

References and further reading

Primary and authoritative sources used

  • Facility Guidelines Institute. 2026 FGI Codes for Planning and Design (Hospital, Outpatient, Residential), released August 31, 2026; FGI is the primary source for the ICRA requirement in U.S. healthcare design and construction. fgicodes.org. Release announcement: FGI launches 2026 FGI Codes and Handbooks.
  • American Society for Health Care Engineering. ASHE ICRA 2.0 Matrix of Precautions for Construction, Renovation and Operations (published April 20, 2022). ashe.org/icra2. Announcement: ASHE publishes updated infection control risk assessment.
  • Centers for Disease Control and Prevention and HICPAC. Guidelines for Environmental Infection Control in Health-Care Facilities (2003, updated July 2019), developed with HICPAC. Part II recommendations: cdc.gov
  • The Joint Commission. Accreditation 360, Updated Accreditation Manual: Physical Environment Chapter (webinar slides and transcript, 2025). jointcommission.org (webinar slides, PDF)
  • Centers for Medicare and Medicaid Services. 42 CFR 482.41, Condition of participation: Physical environment (ecfr.gov), and 42 CFR 482.42, Infection prevention and control and antibiotic stewardship programs (ecfr.gov).
  • National Fire Protection Association. NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations. nfpa.org
  • National Fire Protection Association. NFPA 101, Life Safety Code. nfpa.org
  • ASHRAE. ANSI/ASHRAE/ASHE Standard 170-2025, Ventilation of Health Care Facilities (read-only access page). ashrae.org

Optional trade reading

This guide is general information for planning and field use. It does not replace your facility’s ICRA policy, your authority having jurisdiction, or the current editions of the codes and standards adopted where you operate.

Sizing the negative air? The companion Negative-Air and CFM Calculator turns this zone’s dimensions and target air changes into a machine count, with a printable sizing worksheet.

Updated 2026-10-31: strengthened with primary-source procedural depth (Clarity topic gap pass).